Extensive rehabilitation work on Munich’s Goethestrasse

BauWa25 lifts off

On Goethestrasse in Munich, Bauer Resources literally lifted off – in the truest sense of the word. The order was standard: Rehabilitation including dismantling, excavation pits and groundwater treatment. In a total, an impressive 12,000 m3 of soil were moved. The true highlight of this project: For the first time in the company’s history, a BauWa25 weighing 4.5 t was airlifted by helicopter out of the urban excavation pit. A spectacular achievement, isn’t it? 

Facts about the project
Company :

BAUER Resources GmbH, Bauer Umwelt Division

Location :

Goethestraße, 80336 Munich

Period :

November 2016 to August 2019

Services :

Dismantling, brownfield remediation, soil excavation, dewatering & treatment

High above the roofs of Munich

Time for the next project?

Get in touch with us.

Frank Tidden
Head of Sales

Region South-West, South, Switzerland